Construction companies do not always maintain detailed employee timesheets or individual employee records for every job site. In some cases, there is also no Work Plan that the system could use to automatically determine how much of the labor cost should be allocated to a specific project.
Even with this simplified workflow, however, it is important to maintain accurate construction payroll accounting and track labor costs by project.
Dedal CPMS supports a simplified workflow for these situations: the payroll amount can be entered manually and then allocated across the relevant projects — for example, in proportion to their budgets.
In this guide, we explain how to process construction payroll without timesheets or a Work Plan, allocate labor costs across projects, and include the resulting data in project reporting.
Open the “Payroll Accrual” document and go to the “General” tab.
Complete the main document fields:
● Document No. — the document number. It is generated automatically but can be changed if necessary;● Organization — the legal entity for which payroll is being processed;● Date — the document date;● Period — the payroll period, for example, “August 2026”;● Accrual Type — select “Individual Calculation”;● Date From / Date To — the period for which payroll is being calculated;● Accrual Amount — the total payroll amount;● Name — a short document name, for example, “Payroll Accrual for 08/2026”;● Comment — if required.
Important. If no timesheet is maintained for the project, Dedal CPMS will display a warning when the document is completed or posted, indicating that there is no timesheet for the selected period. This warning does not block the process: you can close it and continue with the payroll calculation.
Go to the “Accruals” tab.
Add the employee for whom payroll needs to be calculated. If the accrual applies to several employees, you can add multiple rows to the document.
In this scenario, individual employee records are not maintained for the project. Therefore, the document uses the employee assigned in the system to the relevant site as the site supervisor.
Enter the payroll amount for each employee manually. Because no timesheet is available, the calculation is not based on hours worked.
Once the data has been entered, verify that the total amount for all employees matches the total shown on the “General” tab.
Click “Save” before moving to the next step.
The next step is to assign the accrued labor costs to the relevant projects.
Go to the “Allocation by Project” tab and click “Allocate”. The “Payroll Allocation by Project” window will open.
1. Select the Projects
Select the projects across which the payroll amount should be allocated.
2. Choose an Allocation Method
Dedal CPMS provides several allocation methods:
● “Equally”;● “Proportionally”;● “By Timesheet Hours”.
Because no timesheet is used in this example, the “By Timesheet Hours” option is not applicable.
For this workflow, select “Proportionally”.
3. Select the Allocation Basis
For proportional allocation, you can use “Fixed Project Budget”, for example, as the allocation basis.
The system calculates each selected project's share of the combined project budgets and determines the corresponding percentage for labor cost allocation.
This makes it possible to allocate construction labor costs by project even when timesheet or Work Plan data is unavailable.
4. Run the Allocation
Click “Allocate”.
Dedal CPMS automatically calculates the amount to be assigned to each project based on the calculated shares.If the automatically calculated amount for a particular project needs to be changed, enable the “Manual” option in the corresponding row and adjust the value.
After the allocation is confirmed, the system populates the table on the “Allocation by Project” tab. It shows how much has been accrued for each employee and how the amount has been allocated across projects.
Make sure that the “Balance” field is 0.00. This confirms that the entire payroll amount has been fully allocated across the selected projects.
After checking the data, click:
● “Post” — to save the result and continue working with the document;● “Post and Close” — to post the document and close it immediately.
Once the document has been posted, the accrued and allocated amounts are included in Dedal CPMS project reporting, including the “Project Report”, “Funds Report”, “Cash Flow Statement”, and other relevant reports.
Even if a company does not yet use detailed timesheets or a Work Plan, labor costs do not have to remain outside its project cost accounting.
Dedal CPMS allows construction companies to:
● record the payroll amount;● assign labor costs to the relevant construction projects;● automatically allocate costs using a selected allocation basis;● manually adjust the allocation when necessary;● use the resulting data for further project analysis and reporting.
This approach helps companies maintain accurate construction project cost tracking based on their actual operating model and gradually increase the level of accounting detail without having to implement every available mechanism from the outset.